The Reconstruction and Extension
of the Pezinok Capuchin Monastery Site Project

Estimated costs

The roof and beam restoration: 16 mil SKK (531102 €)
The renovation of the monastery building – the interior and facilities: 28 mil SKK (929429 €)
The destruction of the former dwelling unit:
The modification of the connection to the main piping system:
The construction of the Franciscan Institute building:
The renovation of the building exterior and the garden:
The full renovation of the church interior:
The restoration of the church interior:
Additional surveys: